DECORATIVE FLOORING__MULTI FEATHER SKIM_Fine Feather Skimming Plaster - MCCSA
10068
page-template-default,page,page-id-10068,page-child,parent-pageid-7810,ajax_fade,page_not_loaded,,qode-theme-ver-3.10,wpb-js-composer js-comp-ver-6.1,vc_responsive
 

MULTI FEATHER SKIM 

FINE FEATHER SKIMMING PLASTER 
 

DESCRIPTION

MULTI FEATHER SKIM is a fine finishing and feathering plaster for use on dry walls, ceiling boards, concrete soffits, and pre-cast blocks. Skim-on application that leaves a smooth, plastered surface.  

 

TYPICAL APPLICATIONS

MULTI FEATHER SKIM provides a hard-wearing non-dusting plastered surface over the following interior substrates: 

  • Dry walls 
  • Masonry 
  • Ceiling boards 
  • Soffits 
  • Concrete blocks 

 

ADVANTAGES

  • Dust-free surface 
  • Smooth application 
  • Fast setting 
  • Light weight 
  • Low VOC  
  • No need for bonding liquids 

 

TYPICAL PROPERTIES

Colour on setting: OffGrey  

Drying Time: 20 minutes 

Time to sanding: 60 minutes 

Application Thickness: 6mm to feather

Initial Setting Time: 10 min 

Working Time: 10-15 min 

Compressive Strength: 15 MPa 

Water Requirement: 4.5L per 20kg 

Yield on 20kg: 15L 

 

WATCH POINTS

  • Do not re-constitute the mix after initial setting has occurred.  
  • Colour of the screed surface on setting may not uniform in appearance. 
  • Do not apply over damp surfaces or where moisture is a concern. 

DIRECTIONS FOR USE

 

SURFACE PREPARATION

Surfaces are to be clean, sound and free of dust and deleterious substances.  

 

PRIMING

No priming required, apply directly onto surfaces to be skimmed.  

 

MIXING

Mix 4.5L clean water with 20kg of MULTI FEATHER SKIM well in a bucket using a mechanical mixer. Ensure all lumps have been broken up. 

 

APPLICATION

Using a steel trowel, skim over the surfaces evenly. Allow to harden and then polish smooth using the wetted surface of the steel trowel face. Allow to dry for 8 hours before overcoating. If needed, sand with 100-120 grit sandpaper to remove high points and polish to a hard, dustfree surface prior to overlay installation. 

 

EQUIPMENT CARE

All tools should be cleaned with water immediately after use. If delayed, equipment will need mechanical action to clean or be discarded. 

 

PACKAGING

Supplied in 20kg bags. 

 

QUALITY ASSURANCE

Multi Construction Chemicals South Africa (PTY) Ltd production and testing programs comply with all local and international testing standards. 

 

REVISION: 3.1 

The information supplied is believed to be reliable. As we do not have any control over the processing or application of the product we cannot guarantee the results to be obtained.

Users assume all risks and liability resulting from the use of this product and must confirm suitability thereof by conducting their own tests.

No guarantee is expressed or implied. Liability to the replacement of faulty material.

FOR PROFESSIONAL USE ONLY.